STOCK PROGRAM

Eastern Special Metals holds a large number stock of seamless tubes and pipes to meet customers urgent delivery requirements.

*Heat Exchanger Tube: Eastern Special Metals holds a certain number of 38mmx3mm semi-finished tubes for revamp replacement projects which might need urgent delivery within 30 days or less. 

*Nickel Alloy Tube and Pipe: the long lead time of Nickel Alloy tube and pipe has always been a long-standing problem worldwide, Eastern Special Metals regularly holds about 50 tons of mother tubes and pipes of N06625, N08020, N4400, N08800, and N08825, etc., which enable us to contain the lead time within 80 days or less.   

*Instrumentation Tube: as standard products, Eastern Special Metals continuously holds 100,000 meters of BA tubes in sizes of 1/4”, 3/8”,1/2”,3/4”, 1” and also a small number of JIS size BA Tubes, all BA Tubes internal roughness has been divided into three levels: RA≤0.4μm,0.4μm≤RA≤0.6μm and RA≤0.8μm.